SEQUABAT HAS HANDED OVER THE SECOND PHASE OF A LOGISTICS PLATFORM FOR THE 3R GROUP IN CASTELNAU-D’ESTRÉTEFONDS (HAUTE-GARONNE)

SEQUABAT HAS HANDED OVER THE SECOND PHASE OF A LOGISTICS PLATFORM FOR THE 3R GROUP IN CASTELNAU-D’ESTRÉTEFONDS (HAUTE-GARONNE)

SEQUABAT HAS HANDED OVER THE SECOND PHASE OF A LOGISTICS PLATFORM FOR THE 3R GROUP IN CASTELNAU-D’ESTRÉTEFONDS (HAUTE-GARONNE) 540 337 GROUPE IDEC

SEQUABAT HAS HANDED OVER THE SECOND PHASE OF A LOGISTICS PLATFORM FOR THE 3R GROUP IN CASTELNAU-D’ESTRÉTEFONDS (HAUTE-GARONNE)

3 February 2020
SEQUABAT, the subsidiary of the IDEC GROUP that specialises in the design and construction of turnkey projects involving business and residential property, has just completed the second and final phase of a logistics warehouse for the 3R GROUP. Located in the heart of the Eurocentre multimodal park, the whole of this project built in Castelnau-d’Estrétefonds (Haute-Garonne) stretches out over almost 20,000 m².

Read more